Skip to content
CrInf

Back to Services

Scheduled maintenance

Technical servicing every 3 or 6 months on docks, drones and batteries, according to how heavily each enclosure is used.

Enclosure equipmentThe components involved in the service: ultrasonic weather station, docking station closed and open, status beacon, dome camera and satellite antenna.Weather stationDocking station closedOpen, with drone in flightultrasonic, no moving partsown anemometer at 1.8 mcovers open to the sidesStatus beaconDome cameraSatellite antennagreen, amber, red360°, with heatingflat panel

Scheduled maintenance deals with what never triggers an alert but ends in a failure: the dock that opens with difficulty, the battery nearing the end of its cycle, the obstruction that has not yet blocked anything.

Keeping the enclosure clear is not tidiness: it is a condition for operating.

Each cycle closes with a report per enclosure covering what was inspected, what was corrected and what is worth attending to before the next one.

What it includes

  • Docking station

    Full opening, clearance of the manoeuvring area, condition of the covers and of the docking system.

  • Drones

    General condition, flight verification and inspection of wear points.

  • Batteries

    Cycles used, effective capacity and detection of units failing ahead of time.

  • Data link

    Satellite antenna, alignment and link quality.

  • Enclosure

    Obstructions, drainage, condition of the fence and of the slab.

Industries

  • Oil & Gas
  • Energy
  • Mining
  • Security
  • Public sector

Request a proposal